Work is underway on the access to the 7,400 future homes in La Hoya with Torrevieja’s roundabout number 14 under construction on the CV-905.
Heavy machinery is already employed the new roundabout that will provide entry to the macro-urbanization of La Hoya in Torrevieja and its commercial area.
The new island will be located halfway between the one that gives access to C/José Carreras and the one at urbanization La Siesta, at C/Antonio Mirete Sáez, in the urbanization Altos del Limonar.
Expropriation
The work is causing some disruption with the loss of one carriageway on the CV-905 and the bike lane also because water safety bio waves are being installed to receive rainwater from a residential area that has the capacity to house up to 7,400 homes and whose first phases are already being sold.
Access to commercial area and housing
The roundabout will also give access to the commercial area: one hundred thousand square metres in parallel with the CV-905 where the multinational DIY Bauhaus and other shops, bars and supermarkets, including Consum, will be opened.
The CV-905 is Torrevieja’s main access road, used by about 30,000 vehicles every day. The residential tourism of majority national origin. The entire section has a speed limitation of fifty kilometres per hour. Since last September it has been monitored by a state-of-the-art radar at kilometre seven of the road, which has already been vandalized painting over the video surveillance cameras and the radar itself.